ai-roi:executive permission.
The tab appears once both required setup steps have data arriving. Until then, AI ROI opens on Setup.
What’s on the tab
Use the On this page rail on the left to jump between sections. The date range at the top applies to everything.
Executive summary
Three score tiles, each out of 100:- Velocity: how fast work reaches production.
- Productivity: how much AI spend turns into shipped work.
- Efficiency: how much AI spend was avoidable.
Scores over time
A line per score across the selected range. Each point scores the 28 days up to it (fewer near the start of the range), the same way the tiles are scored, so the last point matches the tiles. A point a day for short ranges, a point a week for long ones. Days with too few released PRs have no point. If the whole range is too short or too quiet, the chart says “Not enough released PRs in this range to score yet.” Use the legend to hide or show a score.Teams
One row per team:
A team is flagged when:
- its cost per merged PR is up 25% or more on the previous period (high at 50%), or
- its spend is up 20% or more and at least 25 points ahead of its merged PRs (spend is growing faster than output).
Related
- Scores: what each score measures and how it is calculated.
- Engineering Overview: one team in detail.
- How the numbers work